← Back to contracts

PROJECT TITLE: ON I-5 FROM I-405 TO YALE AVENUE ADD ONE MIXED FLOW LANE IN EACH DIRECTION ON THE I-5 WITHIN THE PROJECT LIMITS. ADDITIONAL PROJECT IMPROVEMENTS INCL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. ON I-5 FROM I-405 TO YALE AVENUE ADD ONE MIXED FLOW LANE IN EACH DIRECTION ON THE I-5 WITHIN THE PROJECT LIMITS. ADDITIONAL PROJECT IMPROVEMENTS INCLUDE RE-STRIPING THE LIMITED-ACCESS HOV LANE TO CONTINUOUS-ACCESS, RE-ESTABLISHING EXISTING AUXILIARY LANES, ADDING NEW AUXILIARY LANES WHERE NEEDED, AND MODIFYING RAMP CONFIGURATIONS AT SELECT LOCATIONS. ROADWAY ELEMENTS INCLUDE PAVEMENT PRESERVATION, STORM DRAIN SYSTEM RESTORATION, ROADSIDE SAFETY IMPROVEMENT, ROADSIDE SIGN REPLACEMENT, STORM WATER MITIGATION, WEIGH-IN-MOTION SYSTEMS RELOCATION, AND CENSUS STATION INSTALLATIONS, ALONG WITH NECESSARY TRAFFIC SAFETY DEVICES TO PROTECT SUCH INSTALLATIONS.

US Department of Transportation grant awarded #693JJ22530000Y230CA6212034

Summary

PROJECT TITLE: ON I-5 FROM I-405 TO YALE AVENUE ADD ONE MIXED FLOW LANE IN EACH DIRECTION ON THE I-5 WITHIN THE PROJECT LIMITS. ADDITIONAL PROJECT IMPROVEMENTS INCL :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. ON I-5 FROM I-405 TO YALE AVENUE ADD ONE MIXED FLOW LANE IN EACH DIRECTION ON THE I-5 WITHIN THE PROJECT LIMITS. ADDITIONAL PROJECT IMPROVEMENTS INCLUDE RE-STRIPING THE LIMITED-ACCESS HOV LANE TO CONTINUOUS-ACCESS, RE-ESTABLISHING EXISTING AUXILIARY LANES, ADDING NEW AUXILIARY LANES WHERE NEEDED, AND MODIFYING RAMP CONFIGURATIONS AT SELECT LOCATIONS. ROADWAY ELEMENTS INCLUDE PAVEMENT PRESERVATION, STORM DRAIN SYSTEM RESTORATION, ROADSIDE SAFETY IMPROVEMENT, ROADSIDE SIGN REPLACEMENT, STORM WATER MITIGATION, WEIGH-IN-MOTION SYSTEMS RELOCATION, AND CENSUS STATION INSTALLATIONS, ALONG WITH NECESSARY TRAFFIC SAFETY DEVICES TO PROTECT SUCH INSTALLATIONS.

PROJECT TITLE: ON I-5 FROM I-405 TO YALE A…
$25M+
Onboard