← Back to contracts

APPLICATION PURPOSE: THE PROJECT WILL RECONSTRUCT THE VALLEY TRANSIT CENTER WITH EXPANDED PASSENGER AMENITIES ADA FEATURES SAFETY ENHANCEMENTS AND TRANSIT FACILITIES AS WELL AS IMPROVED TRANSIT OPERATIONS. THE PROJECT PLANS TO BUILD HOUSING UNITS ABOVE THE NEW TRANSIT CENTER IN A FUTURE PHASE OF THE PROJECT.; ACTIVITIES PERFORMED: THE PROJECT IS LOCATED AT 100 EAST WASHINGTON STREET IN DOWNTOWN APPLETON WISCONSIN.THE PROJECT CONSISTS OF CONSTRUCTION OF A NEW LARGER GROUND LEVEL TRANSIT CENTER AND A BASEMENT LEVEL WITH FUNCTIONS SHARED BY THE TRANSIT CENTER.THE REDESIGNED BUS PLATFORMS AND DRIVE AISLES ARE TO BE FULLY COVERED FOR PROTECTION FROM INCLEMENT WEATHER. THE NEW PLATFORM AREA INCLUDES SPACE FOR 14 BUSES. THE BASEMENT OF THE TRANSIT CENTER WILL BE DESIGNED TO FUNCTION AS AN EMERGENCY OPERATING CENTER (EOC) DURING CATASTROPHIC EVENTS. THE PROJECT INCLUDES INNOVATIVE FEATURES THAT IMPROVE ENERGY SECURITY AND ENSURE CONTINUITY OF OPERATIONS DURING MAIN GRID DOWN EVENTS. THE TRANSI

US Department of Transportation grant awarded #WI-2026-007

Summary

APPLICATION PURPOSE: THE PROJECT WILL RECONSTRUCT THE VALLEY TRANSIT CENTER WITH EXPANDED PASSENGER AMENITIES ADA FEATURES SAFETY ENHANCEMENTS AND TRANSIT FACILITIES AS WELL AS IMPROVED TRANSIT OPERATIONS. THE PROJECT PLANS TO BUILD HOUSING UNITS ABOVE THE NEW TRANSIT CENTER IN A FUTURE PHASE OF THE PROJECT.; ACTIVITIES PERFORMED: THE PROJECT IS LOCATED AT 100 EAST WASHINGTON STREET IN DOWNTOWN APPLETON WISCONSIN.THE PROJECT CONSISTS OF CONSTRUCTION OF A NEW LARGER GROUND LEVEL TRANSIT CENTER AND A BASEMENT LEVEL WITH FUNCTIONS SHARED BY THE TRANSIT CENTER.THE REDESIGNED BUS PLATFORMS AND DRIVE AISLES ARE TO BE FULLY COVERED FOR PROTECTION FROM INCLEMENT WEATHER. THE NEW PLATFORM AREA INCLUDES SPACE FOR 14 BUSES. THE BASEMENT OF THE TRANSIT CENTER WILL BE DESIGNED TO FUNCTION AS AN EMERGENCY OPERATING CENTER (EOC) DURING CATASTROPHIC EVENTS. THE PROJECT INCLUDES INNOVATIVE FEATURES THAT IMPROVE ENERGY SECURITY AND ENSURE CONTINUITY OF OPERATIONS DURING MAIN GRID DOWN EVENTS. THE TRANSI

APPLICATION PURPOSE: THE PROJECT WILL RECO…
$25M+
Onboard