← Back to contracts

PROJECT TITLE: ROUTE 1 RECONSTRUCTION OF MULTIPLE BRIDGES (HAGATNA TO PITI), ASAN CULVERT (NO.27) AND LAGUAS BRIDGE (NO.35) :::: PROJECT DESCRIPTION: THIS IS A DEFENSE ACCESS ROAD (DAR) PROJECT. THIS PROJECT CALLS FOR THE REPLACEMENT OF THE FOLLOWING FIVE (5) BRIDGES: ATANTANO BRIDGE (NO.01), LAGUAS BRIDGE (NO.35), SASA BRIDGE (NO.36), FONTE BRIDGE (NO.4) AND ASAN CULVERT (NO.27) LOCATED ALONG ROUTE 1 (MARINE CORPS DRIVE) TO PROVIDE FOR THE CONTINUOUS LONG-TERM FUNCTIONALITY AND SAFETY OF THE BRIDGES FOR THE LOCAL COMMUNITY AND MILITARY OPERATIONS IN GUAM. THIS PORTION OF THE PROJECT IS FOR THE REPLACEMENT OF TWO (2) OF THE FIVE (5) BRIDGES [(ASAN CULVERT (NO.27) ALSO KNOWN LOCALLY AS ASAN #1 BRIDGE, AND LAGUAS BRIDGE (NO.35)] LOCATED IN THE MUNICIPALITIES OF ASAN AND PITI, RESPECTIVELY.

US Department of Transportation grant awarded #693JJ2254000073AFGQ0001131

Summary

PROJECT TITLE: ROUTE 1 RECONSTRUCTION OF MULTIPLE BRIDGES (HAGATNA TO PITI), ASAN CULVERT (NO.27) AND LAGUAS BRIDGE (NO.35) :::: PROJECT DESCRIPTION: THIS IS A DEFENSE ACCESS ROAD (DAR) PROJECT. THIS PROJECT CALLS FOR THE REPLACEMENT OF THE FOLLOWING FIVE (5) BRIDGES: ATANTANO BRIDGE (NO.01), LAGUAS BRIDGE (NO.35), SASA BRIDGE (NO.36), FONTE BRIDGE (NO.4) AND ASAN CULVERT (NO.27) LOCATED ALONG ROUTE 1 (MARINE CORPS DRIVE) TO PROVIDE FOR THE CONTINUOUS LONG-TERM FUNCTIONALITY AND SAFETY OF THE BRIDGES FOR THE LOCAL COMMUNITY AND MILITARY OPERATIONS IN GUAM. THIS PORTION OF THE PROJECT IS FOR THE REPLACEMENT OF TWO (2) OF THE FIVE (5) BRIDGES [(ASAN CULVERT (NO.27) ALSO KNOWN LOCALLY AS ASAN #1 BRIDGE, AND LAGUAS BRIDGE (NO.35)] LOCATED IN THE MUNICIPALITIES OF ASAN AND PITI, RESPECTIVELY.

PROJECT TITLE: ROUTE 1 RECONSTRUCTION OF M…
$25M+
Onboard